Search

Search Results

Tips for travel during Labor Day transbay shutdown

1. Tips for Cyclists 2. Tips for Airport Travelers 3. Tips for Riders with Mobility Challenges 4. Tips for Travel within the East Bay 5. Tips for Travel within San Francisco/West Bay 6. Tips for Paying for Your BART Ride with the free Bus Bridge 7. Tips for Transbay Muni/BART riders 8. Tips for Moving between

Expect late-evening delays in Transbay Tube for earthquake safety work

We are continuing to work to make the BART system safer in the event of an earthquake. Beginning this week and continuing until the end of January, there will be some late evening work performed in the Transbay Tube, which means we can use only one track after 10 pm. We are working to complete a power supply

Artist uses classic Japanese woodblock technique to create poster series

Watch the video

BART selected Berkeley artist, Miwako Nishizawa, to create pieces for its 2016 poster art series. Ms. Nishizawa was born in Kyoto, Japan and creates artwork adapting moku-hanga, the traditional Japanese woodblock technique. She began using this medium soon after her arrival to the United States as a way to

Temporary relocation of ADA parking at Coliseum Station 1/14

As part of BART’s systemwide Earthquake Safety Program, seismic retrofit work at the Coliseum Station continues and expands to the northside of the Station (outside the Concourse). This construction, consists of seismic retrofit work performed on each footing and pier cap (a beam connecting two columns) that

Earthquake Safety work to begin in concourse at Fruitvale Station

As part of BART’s systemwide Earthquake Safety Program, seismic retrofit construction inside the Fruitvale Station, in the concourse, will be performed on each footing and pier cap (a beam connecting two columns), which supports the BART trackway under the alignment and is expected to begin in September 2018