Downtown Berkeley Station: elevator work on Tuesday, April 15
In advance of the renovation of the elevators at our Downtown Berkeley Station, crews will conduct a site visit on Tuesday, April 15, 2025 to get measurements, pictures and other related information.
As a result, between 10am and 2pm that day, the elevators will be shut down in 20 minute increments. This will be the case at both the street to concourse level elevator, as well as the concourse to platform level elevator. The elevators will remain operational the entire day, but there may be times when riders will be asked to wait to board while the preliminary renovation work is being done. Signage will be posted.
To check if an elevator is in service before arriving at a station, please call 510-834-LIFT (510-834-5438) or 888-2-ELEVAT (888-235-3828), or sign up for elevator status alerts at www.bart.gov/elevators. If you arrive at any station and find that the elevator(s) are out of service, you may contact a Station Agent to arrange for a lift van to take you to a nearby station with a working elevator.