This story is archived. Visit bart.gov/news for the latest BART news.

Millbrae Station - changes on Rollins Road and shuttle stops locations during construction

Starting Wednesday, August 18th, Rollins Road will be reduced to one vehicle lane in each direction, between Millbrae Avenue and the BART parking garage, due to construction taking place until the end of 2022. This may cause delays in entering or exiting the BART garage and passenger loading zone.

Rollins Road between Millbrae Ave. and the BART station will remain open to vehicles and pedestrians at all times. The exit from the Garage 2nd Floor to Harriet Tubman Road will also remain open, connecting to Rollins Road south of Millbrae Ave. (see map).

Additionally, there will be minor changes to shuttle stops.  Please coordinate with your shuttle operator to confirm their stop location.

Pedestrian access on Rollins Road between Millbrae Ave. and the BART station will remain open at all times.

Please allow additional time to reach the station.

PROJECT
UPDATES

For project details, construction updates, parking lot closure notifications and alternative transportation options for accessing the station, visit:
 

www.gatewayatmillbraestation.com | Hotline: 888-354-0464

pdf of map

Passenger bulletin-changes to Rollins Road and shuttle stops