Pleasant Hill Station Passenger Loading Zone Detour 3/25-4/05
Due to construction, there will be a detour for the passenger loading zone at Pleasant Hill BART from 3/25 to 4/5/2021 (see map).
A section of the passenger loading roadway will be closed in both directions adjacent to Coggins Dr.
During this construction, the passenger loading zone will be temporarily relocated to Wayne Dr., which can be accessed from Oak Rd. or Las Juntas Way (via Anthony Way). Vehicles will exit the passenger loading through the BART Garage to Jones Rd. Please note that the Garage has a maximum clearance of 8’4” -- vehicles over this height will need to U-turn or load passengers elsewhere.
Accessible passenger loading will remain in the existing location. Users should enter from Wayne Dr., turn right on Barclay Dr., and do a U-turn to access the existing accessible passenger loading.