Passenger Loading and Shuttle Stops Moving at Millbrae Station 5/18/20
On Monday, 5/18/2020, the Millbrae Station’s east side passenger loading zone will be moved to its new permanent location on the 1st floor of the garage. Access to the rest of the garage parking will be the same as before.
Shuttle bus stops will move to Rollins Road. Please see the map.
The new loading zone will be protected from weather and will feature better lighting and separate zones for active passenger loading, ride apps, taxis, and15 min waiting spaces.
The old loading zone will be permanently closed for the Gateway at Millbrae Station project which is part of the BART's initiative to encourage Transit Oriented Development (TOD), and will include housing, retail, and dining opportunities. A portion of the housing will be affordable and is prioritized for veterans.
For project details, construction updates, parking lot closure notifications and alternative transportation options for accessing the station, visit:
www.gatewayatmillbraestation.com | Hotline: 888-354-0464