This story is archived. Visit bart.gov/news for the latest BART news.

BART elevators set to receive makeovers, will be closed as flooring replaced

UPDATE 12/14/2015: THE MODIFICATIONS ARE ON HOLD.

(We are addressing some technical issues with the modifications and will post a new schedule as soon as the issues are resolved).

It’s no secret that BART’s elevators can be filthy – and part of that problem stems from shortcomings surrounding the original design and building material.  Differently abled riders and people with luggage shouldn’t have to hold their noses to get where they need to go, so to better serve our customers BART will begin to clean and replace the flooring in all 127 passenger elevators starting August 24th.

The work will be done in stages during the week on elevators in both parking garages and stations through December 2016.  This means elevators will be removed from service when the work moves to that station, requiring people dependent on elevators to change transportation plans on the dates work is being done.

We strongly advise that you check before you travel if your elevator is in service at both your home and destination stations by calling 510-834-LIFT (5438) or 888-2-ELEVAT (353828).

BART has selected a high quality stainless-steel diamond-plate flooring to replace the current material, as the old material readily absorbs liquids and odors that can corrode and damage underlying structures.  After tearing out the old flooring, technicians will thoroughly clean, disinfect, and repair the entire elevator, including any areas under the floor that have been damaged by urine or liquid intrusion.  The new flooring will then be installed, and the floor completely sealed to prevent this problem from reoccurring.

The schedule of closures will be updated as new information becomes available, as will the phone lines listed above and LED signs on Station Agent booths.