Upcoming Procurements

 

PUBLIC WORKS CONTRACTS (CONSTRUCTION)

Contract Number

Title

Int. Projected Advertisement

Rev. Projected Advertisement

Contact

Est. Value

03QJ-110A

Concord Yard Wheel Truing Facility

Dec 2023

May 2025

[email protected]

$37M

17HM-110 

Met-G Generator Replacement

Aug 2024

Mar 2025

[email protected]

$9M - $10M

15TC-206

Custom Fabricated Material Procurement for EBay Street Level Vent Grates

Oct 2024

Apr 2025

[email protected]

$5M

17BY-110A 

LMA UPS System Installation

Dec 2024

Apr 2025

[email protected] 

$13M

15CQ-211B

Procurement of Direct Fixation Fastener Assembly

Apr 2025

Apr 2025

[email protected] 

$2.5M - $3M

6M3731B

Handrails Replacement, Repairs and Services

Apr 2025

TBD

[email protected] 

$1.5M

 

 

Future Construction Contracts Through 2025

*DISCLAIMER:  The information provided below is preliminary and subject to change.  Bidders shall not rely on this information below in preparing any bid submittals. Information provided cannot be relied upon for activities including but not limited to design, construction, and construction management purposes.  The District will not provide any additional information or any inquiries until these contracts are advertised. 

Project Name

Contract Description

Estimated Construction Cost

Millbrae Tail Tracks ‐ Phase 2

Construction of retaining walls, drainage, etc. in support of extending tail tracks at Millbrae

$7‐$10M

Station Fire Alarm Replacement‐Phase 4

Furnish, install, test and commission the station fire alarm replacements at the various station locations.

$4‐$7M

Water Intrusion at Train Control Room

Structural repair/restoration to train control room locations.

$3‐$6M

LMA HVAC Renovation

Replace the 50‐year‐old HVAC system that serves the Lake Merritt (LMA) complex including the Operations Control Center (OCC) and computer rooms.

$10‐$15M

Control Tower HVAC (OCY, ORY)

Replace and upgrade the HVAC equipment servicing the Concord and Richmond Yard control towers.

$1‐$5M

Replace Sewage Pumps

Replace sewage pumps at various locations. 

$1‐$3M

Embarcadero Platform Elevator

Work at Embarcadero Station consists but is not limited to the renovation of the existing hydraulic elevator, with a new elevator machine room and new stair at the south side of the station.

$10‐$15M

TBT Tunnel Lighting Replacement Phase 2- (ON HOLD - DESIGN- 02-01-2022)

Upgrade and installation of new tunnel lighting fixtures in Transbay Tube.

TBD

TP Core Capacity Project East Bay (RPA, KTF, CMR, AHM) (On Hold)

Design, procure and install three new substations.
 

TBD

Re-Roof Facilities Buildings Systemwide

Replacing facility roofs on a priority basis to maintain state of good repair system-wide.

TBD

Washington Ave Steel Bridge

Repair the Washington Ave steel bridge based on the inspection performed in the previous biennial bridge inspection.

TBD

MUX Cable Replacement

Procure new cable that handles and allows simultaneous transmission of several messages and signals through a network of cable connections between the wayside train control MUX cabinets to its matching Train Control Room MUX equipment.

TBD

Dublin/Pleasanton Stn Access Improvement

Project will improve bicycle and pedestrian access to the Dublin/Pleasanton BART station.

TBD

Pitts BayPt Mobility Improvement

Improve pedestrian and bicycle access to Pittsburg/Bay Point station.

TBD

North Berkeley Machine Room Access Improvement

This project is to create a new door to access the room that can be accessed from the station platform.

TBD

34.5 KV AC Cable Replacement - K Line

Replace the existing 34.5kVAC cables (PIPE or PILC) on the K-Line with new ethylene propylene-rubber (EPR) jacketed medium voltage cable, fiber optic systems and install isolation disconnect switches at the substations. 

TBD

Slope Stabilization MW-12

Design and construct improvements to stabilize the North slope in Walnut Creek (MW-12's benched slope).

TBD

Powell Street Elevator

Design and construction of a new elevator at Powell Street Station allowing access to both MUNI and BART platforms.

TBD

Fencing Replacement

Design and construction of the fences at bridge abutments, yard, and BART right of way

TBD

Met G Generator Replace, 1250 KW

Furnish, install, test, and commission a 1250 kW Generator (with associated infrastructure) at Lake Merritt (LMA) street level, to replace the existing 400 kW Met Building (METG) rooftop generator.

TBD

Fire Suppression System

Remove and replace all fire sprinkler heads at 11 stations

TBD

 

 

MATERIALS, EQUIPMENT & SUPPLIES 

IFB Number

Title

Int. Projected Advertisement

Contact

Est. Value

IFB 9142

Compact Crawler Boom Aerial Lift 

TBD

 [email protected]

$700K

IFB 9144

Ph. III Mobile Genset Procurement 

TBD

[email protected] 

$475K

IFB 9147

Traction Motor Bearings

TBD

[email protected]

$1‐$5M

IFB 9122B

Powered Flat Cars

TBD

[email protected]

$7.8M

IFB 9148 

Hazardous Waste and Materials Storage Shed 

Mar 2025

[email protected] 

$457K

IFB 9143A

Axle Bearings Procurement

TBD

[email protected]

$1‐$5M

 

PROFESSIONAL AND OTHER SERVICES (SERVICES)

Contract Number

Title

Int. Projected  Advertisement 

Rev.Projected 

Advertisement

Contact

Est. Value

6M8215

Construction Management Services 2025

Jun 2025

TBD

[email protected]

TBD

6M7326

State and Federal Legislative Advocacy Services

Apr 2025

TBD

[email protected] 

$700K

6M4905 

Grant Management Solution

TBD

TBD

[email protected] 

$600K

 

MICRO SMALL BUSINESS ENTITY (MSBE) SET-ASIDE CONTRACTS/AGREEMENTS

Contract Number

Title

  Int. Projected     Advertisement  

Rev. Projected   Advertisement  

Contact

Est. Value